Volumetric modular construction is probably the most popular one of the modern methods of construction (MMC).

But when discussing modular construction, I often get more questions than answers. I get it, even some of the seasonal developers could use some guidance sometime.

So first of all, is modular construction worth investigating–or is it just a passing fad? I have compiled some frequently asked questions that I will share in a 3-part series.

Let’s begin the first part:

Is modular right for my project?
Ask yourself the right questions to determine whether your project is a good fit for modular.

  • Am I in a high-priced labor market?
  • Am I in an urban environment where construction may be a major disruption?
  • Do I want to fast-track the construction schedule for this project?
  • Can the bay widths of my units be accommodated with modular?
  • Am I going to build a ground floor podium on my project even if I use traditional construction?

If you answered yes to any or all the questions above, modular most likely work for you.

Anatomy of a modular building

Do I need a specific type of GC to build a modular project?
This is not a requirement, but something we highly recommend.

Modular projects have unique challenges compared to traditional builds. Working with an experienced contractor will save you a great deal of time, money—and headaches.

Modular construction is gaining traction but is still relatively new; with that comes likely setbacks. The entire project team—including the GC, subs, and design team—must work together to tackle potential issues early to avoid overall schedule delays.

When should I make the decision to go modular?
The earlier the better. Modular projects require an entirely different design mindset and will be planned differently than a traditional project.

It is important to discuss this option with your A/E team as soon as possible. If the decision to go modular is made too far into the process, it is likely that any time saved by modular will be lost in redesign time.

We eliminate this client-side confusion by presenting designs (Concept) at the very first stage so that developers can envision the final product prior to committing to or paying for it.

Do I still need an architect and S/MEP engineer with modular?
A modular manufacturer prepares plans, outlining the specific design of the modular boxes. However, it is the responsibility of the architect and engineers to take these plans, coordinate them with all the other disciplines, and design an overall structure that meets adopted building codes.

To perform these essential functions, we recommend hiring a design firm familiar with offsite construction. Modular design demands sophisticated coordination by an experienced firm.

They will also be responsible to act as the Architect and Engineer of Record (AOR/EOR) for the entire building design.

I’ve designed a traditionally framed project. If I choose to go modular, will I need a redesign?
Modular projects have double demising walls that typically increase the thickness between every unit bay, thus increasing the overall footprint.

Also, modular units will be limited on the bay width, MEP configuration, and floor-to-floor heights; therefore, these items must all be redesigned.

If your project is still in design, it might not be too late to convert to modular. I prepared this guide for just that.

Modular construction merits its own design considerations, with even the walls having different assembly than their traditional counterparts

What types of modules are available in the market?
You can choose from steel or wood modular units, based on your project needs.

Steel modules are more sturdy and provide better stability for mid- to high-rise projects.

Wood modules are comparatively lightweight and ideal for low-rises.
It’s important for your designer to understand the geographical location, code requirements, franchise standards (if applicable), and optimal configuration of design choices to fit your modular project.

What is the cost of modular units?
Cost varies greatly depending on the location, building use (e.g., hotels, dorms, apartments), and franchise requirements, if applicable.

The decision to use wood or steel further determines the cost.

Right now, wood modular construction is—for the most part—cost neutral with traditionally wood-framed podium construction.

We recommend reaching out to the modular manufacturers early, so they can provide you with general budgeting numbers specific to your project.

Does my financing structure need to change for a modular project?
In contrast to the typical construction, 60−70% of your entire construction cost to purchase the modules is needed upfront. This is much different than a traditional construction loan draw, and many lenders will need to be educated on this process.

It’s wise to involve your lender during the initial phase if you are considering going modular. Some lenders might need time to figure out lending terms.

The good news is, lender trust is increasing as modular is becoming more common.

We’ve helped several lenders walk through the modular process to facilitate understanding and trust.

How does modular construction shorten my project timeline?
Modular units can be produced offsite at the same time your team is building the foundation and podium at the project site.

As a result, modular construction can typically reduce build-time for a standard 4- to 5-story, 100-unit building, by three to six months when compared to traditional construction methods.

With that said, the timeline may vary greatly depending on the specific project program and site conditions.

Do you have more questions to determine whether modular is right for you? Ask away!

Next week, I discuss common questions for low- to mid-rise modular construction.

Join my mailing list
Thank you,
Blair Hildahl
Base4 Principal
608.304.5228
BlairH@base-4.com

Related Posts

  • SHOULD YOU GO MODULAR WITH YOUR NEXT HOTEL?-PART 2
  • SHOULD YOU GO MODULAR WITH YOUR NEXT HOTEL?-PART 3
  • SHOULD YOU GO MODULAR WITH YOUR NEXT HOTEL?-PART 4
Tagged under: Modular, Prefabrication/Offsite

9 Comments to “ 9 Common Questions About Modular, Answered”

  1. Jim Marks says :Reply
    May 28, 2019 at 5:27 pm

    I am interested in the financing aspect of modular. I am also in the commercial and residential lending space and work with sponsors of ground up multi family. My overall objective would be to refer you business but also get some financing done for the clients. Not many lenders out there that I know of who are financing these projects, so I am hoping to be enlightened. Thank you

  2. Felix Meyer says :Reply
    July 4, 2024 at 6:07 pm

    Amazing Content! If you need some details about about Construction Industry than have a look here Webemail24

    1. Omara Urena says :Reply
      July 5, 2024 at 9:57 am

      Thank you.

  3. ArticleHome says :Reply
    July 7, 2024 at 11:49 am

    This was a delight to read. You show an impressive grasp on this subject! I specialize about Government Systems and you can see my posts here at my blog ArticleHome Keep up the incredible work!

    1. Omara Urena says :Reply
      July 8, 2024 at 8:54 am

      Great, thank you.

  4. Autoprofi says :Reply
    July 9, 2024 at 5:33 pm

    Wow, this post has given me useful info and answered some of my questions. I hope to give something back and aid others like you helped me. Feel free to surf my website Autoprofi about Auto Export.

    1. Omara Urena says :Reply
      July 11, 2024 at 10:09 am

      Great to hear that.

  5. Articlecity says :Reply
    July 10, 2024 at 11:26 am

    Having read your blog, you obviously know what you are talking about. I’m sure visiting my page Articlecity about SEO will be worth your time!

    1. Omara Urena says :Reply
      July 11, 2024 at 10:09 am

      Thank you!

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

HOT NOW

  • Addressing The Rising Construction Costs
  • Major Hotel Prototype Upgrades
  • A Look Into Prefabrication

Popular Topics

loader
Meta Data and Taxonomies Filter

Tags

  •  
    loader
  •  
    loader
  •  
    loader
  •  
    loader
  •  
    loader
  •  
    loader
  •  
    loader
  •  
    loader
  •  
    loader
  •  
    loader
  •  
    loader
  •  
    loader
  •  
    loader
  •  
    loader
  •  
    loader
loader

Join 95,000 industry professionals

We send well-researched and expert-authored articles that help you build better.

Enter your primary/work email

 

STAY UPDATED

With our latest news and insights.

Enter your primary/work email

Florida Registered Architectural Firm - AA26003324

© 2025 BASE4 | All rights reserved.
  • PROJECTS
  • ABOUT
  • DESTINATIONS by BASE4
  • BLOG
  • CAREERS
  • CONTACT
TOP